Periodic Inspection

Periodic Inspections - Qualified personnel, who are familiar with the industrial activities performed at the facility, shall conduct periodic inspections to determine the effectiveness of the Good Housekeeping Measures, Spill Prevention and Response Measures, Erosion Control Measures, Maintenance Program for Structural Controls, Best Management Practices, and the Employee Training Program. The inspection must also identify any existing BMPs that are not being properly or completely implemented. Periodic inspections must be conducted on a frequency of once per quarter, unless otherwise specified in Part V of this permit, relating to Specific Requirements for Industrial Activities. The inspections must be documented through the use of a checklist that is developed to include each of the controls and measures that are evaluated. When revisions or additions to the SWP3 are recommended as a result of inspections, a summary description of these proposed changes must be attached to the inspection checklist. The summary must identify any necessary time frames required to implement the proposed changes. The periodic inspection checklists must be made readily available for inspection and review by authorized TCEQ personnel upon request.
 
   
Site ID.: Evaluator:
Date & Time
 
Good & Housekeeping: extra measures:
Spill Prevention & Response: extra measures:
Erosion & Control: extra measures:
Maintenance & Program: extra measures:
Training & Program: extra measures:
                            
                          
Print to File!